
Container Monitoring(CLS)
Container installation mainly includes assessment of container conditions, checking product information, counting the number of boxes of the cabinet, checking the packaging information and supervising the entire cabinet process. In order to reduce the high risk of replacing the goods after loading the cabinet, the inspector supervised at the packing site to ensure the safe loading of the product you paid.
Inspection points
- Record the container number and trailer number Check whether the container is damaged, humid and special smell, and take pictures of the empty cabinet Check the number of boxes and the condition of the outer packaging, and randomly spot out a few boxes to confirm the actual packaging product Supervise the process of installing the cabinet to ensure the minimization of damage and the maximization of space utilization For container closure, the container lead title, the packet firing form is left to the bottom, record the time of the container's departure